| |
Case Study | Om Logistics : Back to the Future An integrated applicationbuilt over Micro Focus COBOL platformhas enabled Om Logistics to become a Rs 500 crore organization in less than a decade |
| |
Case Study | Ambuja Cements : ERP Masonry Connecting 200 locations, training 2,500 end-users, and migrating data from 8 different legacy systems onto the ERPall in 14 months flat |
| |
Case Study | PVR Cinemas : What Moves Movies Technology has been a key enabler at PVR, helping them concentrate on their core jobto offer a captivating movie watching experience |
| |
Case Study | HDFC Bank : Its about Storage SAN and virtualization provided faster response time for users and enabled higher productivity |
| |
Case Study | Idea Cellular : What an Idea! The decision to outsource IT transformation has worked well for the company |
| |
Case Study | IBM Daksh : Virtual Success IBM was able to achieve seamless network connectivity with the help of network virtualization |
| |
Case Study | Jindal Stainless : Strong as Steel The lack of visibility of real-time information across locations was proving to be costlya robust database was the cure |
| |
Case Study | Madura Garments : Tech in Time, Saves... The right retail solution led to better in-stock movement and sell-through, as well as a better understanding of the consumer buying pattern |
| |
Case Study | Asian Paints : Gattu Goes Hi-tech The PLM platform serves as a key layer within the mature IT framework, and has formed the base for further tech deployments |
| |